Welcome to www.cnctt.com official website!

Magnesium Die Casting Die in pre-hardened steel for prototype volumes for LED lighting housings – cavity tolerance of ±0.05 mm, cavity tolerance ±0.05 mm

Magnesium Die Casting Die in pre-hardened steel for prototype volumes for LED lighting housings – cavity tolerance of ±0.05 mm, cavity tolerance ±0.05 mm. pre-hardened steel for prototype volumes, cav

Get a Quote
Magnesium Die Casting Die in pre-hardened steel for prototype volumes for LED lighting housings – cavity tolerance of ±0.05 mm, cavity tolerance ±0.05 mm
Magnesium Die Casting Die in pre-hardened steel for prototype volumes for LED lighting housings – cavity tolerance of ±0.05 mm, cavity tolerance ±0.05 mm

Magnesium Die Casting Die in pre-hardened steel for prototype volumes for LED lighting housings – cavity tolerance of ±0.05 mm, cavity tolerance ±0.05 mm

Magnesium Die Casting Die in pre-hardened steel for prototype volumes for LED lighting housings – cavity tolerance of ±0.05 mm, cavity tolerance ±0.05 mm. pre-hardened steel for prototype volumes, cav

Contact Number: 18681062885
Product Details

Magnesium Die Casting Die in pre-hardened steel for prototype volumes for LED lighting housings – cavity tolerance of ±0.05 mm, cavity tolerance ±0.05 mm

A Magnesium Die Casting Die works under heat and pressure, so the design problem is thermal: metal has to fill, freeze and release at a rate the cycle time depends on. The Magnesium Die Casting Die described here is built in pre-hardened steel for prototype volumes and developed for LED lighting housings. die design with flow simulation, EDM detail and thermal balancing is applied with tool life and the maintenance interval agreed before building starts.

The parts that matter most are the interfaces: bores, sealing faces, threads and mounting patterns. Those are held to cavity tolerance ±0.05 mm, verified against the drawing, and recorded before anything is packed.

Specification

ProcessDie design with flow simulation, edm detail and thermal balancing
Material / configurationpre-hardened steel for prototype volumes
Size / capacitycavity tolerance of ±0.05 mm
Tolerancecavity tolerance ±0.05 mm
Surface finishpolished, nitrided or shot blasted cavity surfaces
Applicationmagnesium die casting die for LED lighting housings
InspectionDimensional report, material certificate, first article report on request
Lead time7–15 working days for samples, 3–4 weeks for production
Minimum order1 piece for prototypes, from 50 pieces for production pricing

Magnesium Die Casting Die in pre-hardened steel for prototype volumes for LED lighting housings – cavity tolerance of ±0.05 mm, cavity tolerance ±0.05 mm manufacturing detail

Manufacturing process

The operation sequence is decided before the first chip is cut: roughing to leave even stock, semi-finishing, then die design with flow simulation, EDM detail and thermal balancing as the final operation. That order is what keeps cavity tolerance ±0.05 mm stable as the batch runs and the machine warms up.

Material is purchased against a certificate and checked on receipt, so the composition is known before any cutting starts. Work in progress is identified by part number and operation, and the finished parts are deburred, cleaned and protected before they leave the machine area.

Typical applications

Most of the work supplied in this category falls into the following examples.

  • Structural automotive brackets.
  • Heat sink and lighting housings.
  • Gear box and pump bodies.
  • Consumer appliance frames.
  • Electric motor housings.

Magnesium Die Casting Die in pre-hardened steel for prototype volumes for LED lighting housings – cavity tolerance of ±0.05 mm, cavity tolerance ±0.05 mm finished parts

Quality control and documentation

Every batch is measured against the drawing with calibrated equipment, and results are recorded against the part number rather than kept on a scrap of paper.

Material certificates to EN 10204 3.1, dimensional reports and first article inspection reports are issued with the shipment where the application requires them. Calibration dates and measurement uncertainty are recorded alongside every result.

Ordering, lead time and packaging

Quotations are returned within one working day of a complete drawing package. Lead time is quoted from drawing approval, not from the date of enquiry.

Magnesium Die Casting Die in pre-hardened steel for prototype volumes for LED lighting housings – cavity tolerance of ±0.05 mm, cavity tolerance ±0.05 mm inspection and packing

Frequently asked questions

How is porosity controlled?

By gating and venting designed from flow simulation, plus vacuum assistance on structural parts. Impregnation is a repair, not a substitute for correct fill.

What die life should be expected?

Aluminium dies in H13 typically deliver 80,000 to 150,000 shots with scheduled maintenance. Zinc tools run longer because the melt temperature is far lower.

Do you keep tooling and programmes for repeat orders?

Fixtures, tool lists and verified CAM programmes are retained for the life of the part number, so a repeat release runs on the same setup as the first batch without a new proving run.

To discuss magnesium die casting die requirements, send the model and the drawing with the quantities required. Feedback on manufacturability is given free of charge before any order is placed.