Welcome to www.cnctt.com official website!

Die Casting Trim Die in pre-hardened steel for prototype volumes for automotive structural components – shot weights from 50 g to 8 kg, cavity tolerance ±0.05 mm

Die Casting Trim Die in pre-hardened steel for prototype volumes for automotive structural components – shot weights from 50 g to 8 kg, cavity tolerance ±0.05 mm. pre-hardened steel for prototype volu

Get a Quote
Die Casting Trim Die in pre-hardened steel for prototype volumes for automotive structural components – shot weights from 50 g to 8 kg, cavity tolerance ±0.05 mm
Die Casting Trim Die in pre-hardened steel for prototype volumes for automotive structural components – shot weights from 50 g to 8 kg, cavity tolerance ±0.05 mm

Die Casting Trim Die in pre-hardened steel for prototype volumes for automotive structural components – shot weights from 50 g to 8 kg, cavity tolerance ±0.05 mm

Die Casting Trim Die in pre-hardened steel for prototype volumes for automotive structural components – shot weights from 50 g to 8 kg, cavity tolerance ±0.05 mm. pre-hardened steel for prototype volu

Contact Number: 18681062885
Product Details

Die Casting Trim Die in pre-hardened steel for prototype volumes for automotive structural components – shot weights from 50 g to 8 kg, cavity tolerance ±0.05 mm

A Die Casting Trim Die works under heat and pressure, so the design problem is thermal: metal has to fill, freeze and release at a rate the cycle time depends on. Designed for automotive structural components, this Die Casting Trim Die is produced in pre-hardened steel for prototype volumes with die design with flow simulation, EDM detail and thermal balancing. The figures below are the ones recorded at tryout rather than theoretical values.

Tolerance is applied where it does work rather than across the whole drawing. Critical features are held to cavity tolerance ±0.05 mm, non-critical dimensions follow the general machining tolerance, and the difference is stated in the quotation rather than discovered later.

Specification

ProcessDie design with flow simulation, edm detail and thermal balancing
Material / configurationpre-hardened steel for prototype volumes
Size / capacityshot weights from 50 g to 8 kg
Tolerancecavity tolerance ±0.05 mm
Surface finishpolished, nitrided or shot blasted cavity surfaces
Applicationdie casting trim die for automotive structural components
InspectionDimensional report, material certificate, first article report on request
Lead time7–15 working days for samples, 3–4 weeks for production
Minimum order1 piece for prototypes, from 50 pieces for production pricing

Die Casting Trim Die in pre-hardened steel for prototype volumes for automotive structural components – shot weights from 50 g to 8 kg, cavity tolerance ±0.05 mm manufacturing detail

Manufacturing process

Work is carried out with die design with flow simulation, EDM detail and thermal balancing. Tooling, speeds and fixturing are recorded with the part number, so a repeat order starts from a proven process instead of a fresh setup.

Material is purchased against a certificate and checked on receipt, so the composition is known before any cutting starts. Work in progress is identified by part number and operation, and the finished parts are deburred, cleaned and protected before they leave the machine area.

Typical applications

Most of the work supplied in this category falls into the following examples.

  • Structural automotive brackets.
  • Heat sink and lighting housings.
  • Gear box and pump bodies.
  • Consumer appliance frames.
  • Electric motor housings.

Die Casting Trim Die in pre-hardened steel for prototype volumes for automotive structural components – shot weights from 50 g to 8 kg, cavity tolerance ±0.05 mm finished parts

Quality control and documentation

Critical features are measured on calibrated equipment in a controlled room, and the results are filed with the job so that a repeat order can be compared with the first.

Material certificates to EN 10204 3.1, dimensional reports and first article inspection reports are issued with the shipment where the application requires them. Calibration dates and measurement uncertainty are recorded alongside every result.

Ordering, lead time and packaging

Packaging is specified by the part: individual protection for finished surfaces, separation for assemblies, and export crating with a packing list for shipment.

Die Casting Trim Die in pre-hardened steel for prototype volumes for automotive structural components – shot weights from 50 g to 8 kg, cavity tolerance ±0.05 mm inspection and packing

Frequently asked questions

How is porosity controlled?

By gating and venting designed from flow simulation, plus vacuum assistance on structural parts. Impregnation is a repair, not a substitute for correct fill.

What die life should be expected?

Aluminium dies in H13 typically deliver 80,000 to 150,000 shots with scheduled maintenance. Zinc tools run longer because the melt temperature is far lower.

Do you keep tooling and programmes for repeat orders?

Fixtures, tool lists and verified CAM programmes are retained for the life of the part number, so a repeat release runs on the same setup as the first batch without a new proving run.

Drawings are reviewed for manufacturability before quotation, and any feature that adds cost without adding function is pointed out at that stage rather than after the parts are made.