Welcome to www.cnctt.com official website!

Robotic Machine Tending Cell with a gantry frame and servo Z-axis for job shops running mixed batches – cycle times from 8 seconds

Robotic Machine Tending Cell with a gantry frame and servo Z-axis for job shops running mixed batches – cycle times from 8 seconds. a gantry frame and servo Z-axis, cycle times from 8 seconds, supplie

Get a Quote
Robotic Machine Tending Cell with a gantry frame and servo Z-axis for job shops running mixed batches – cycle times from 8 seconds
Robotic Machine Tending Cell with a gantry frame and servo Z-axis for job shops running mixed batches – cycle times from 8 seconds

Robotic Machine Tending Cell with a gantry frame and servo Z-axis for job shops running mixed batches – cycle times from 8 seconds

Robotic Machine Tending Cell with a gantry frame and servo Z-axis for job shops running mixed batches – cycle times from 8 seconds. a gantry frame and servo Z-axis, cycle times from 8 seconds, supplie

Contact Number: 18681062885
Product Details

Robotic Machine Tending Cell with a gantry frame and servo Z-axis for job shops running mixed batches – cycle times from 8 seconds

A Robotic Machine Tending Cell keeps the spindle cutting while nobody is standing in front of the machine, which is measured in spindle hours per day rather than in cycle time. This page covers the Robotic Machine Tending Cell configured with a gantry frame and servo Z-axis and supplied to job shops running mixed batches: robot integration with custom grippers, guarding and machine interface. The headline figure is cycle times from 8 seconds, and the rest of the page explains what it means in daily use.

In practice the difficulty is rarely the nominal size. repeatability ±0.05 mm is held on the features that locate the part in the assembly, and the process is set up so that the first piece and the five hundredth measure the same way.

Specification

ProcessRobot integration with custom grippers, guarding and machine interface
Material / configurationa gantry frame and servo Z-axis
Size / capacitycycle times from 8 seconds
Tolerancerepeatability ±0.05 mm
Surface finishanodised and powder coated frames
Applicationrobotic machine tending cell for job shops running mixed batches
InspectionDimensional report, material certificate, first article report on request
Lead time7–15 working days for samples, 3–4 weeks for production
Minimum order1 piece for prototypes, from 50 pieces for production pricing

Robotic Machine Tending Cell with a gantry frame and servo Z-axis for job shops running mixed batches – cycle times from 8 seconds manufacturing detail

Manufacturing process

Production begins with a drawing and material review. Stock is certified, the operation sequence is fixed, and robot integration with custom grippers, guarding and machine interface is carried out on equipment maintained to hold repeatability ±0.05 mm over a full shift, not just on a first piece.

Material is purchased against a certificate and checked on receipt, so the composition is known before any cutting starts. Work in progress is identified by part number and operation, and the finished parts are deburred, cleaned and protected before they leave the machine area.

Typical applications

Most of the work supplied in this category falls into the following examples.

  • Loading raw castings into machining centres.
  • Unloading finished shafts from lathes.
  • Transferring parts between two operations.
  • Servicing injection moulding machines.
  • Deburring and washing before packing.

Robotic Machine Tending Cell with a gantry frame and servo Z-axis for job shops running mixed batches – cycle times from 8 seconds finished parts

Quality control and documentation

Inspection is not a final formality. Dimensions are checked during the cycle and again at the end, so drift is corrected while there is still stock to remove.

Material certificates to EN 10204 3.1, dimensional reports and first article inspection reports are issued with the shipment where the application requires them. Calibration dates and measurement uncertainty are recorded alongside every result.

Ordering, lead time and packaging

Orders start from a single piece. Samples are quoted from the 3D model, and production pricing follows once quantity, finishing and inspection are agreed.

Robotic Machine Tending Cell with a gantry frame and servo Z-axis for job shops running mixed batches – cycle times from 8 seconds inspection and packing

Frequently asked questions

How much output does machine tending really add?

It converts breaks, changeovers and unattended hours into cutting time. Spindle utilisation typically moves from around 45 per cent to above 80 per cent without changing the process.

What stops a robot cell from running unattended?

Part presentation and recovery, not the robot. Grippers, Input-output handshakes with the machine control and a defined restart routine decide whether faults clear themselves.

Do you keep tooling and programmes for repeat orders?

Fixtures, tool lists and verified CAM programmes are retained for the life of the part number, so a repeat release runs on the same setup as the first batch without a new proving run.

Send the drawing or the 3D model for a quotation. Include material, quantity, tolerance and finish, and a detailed quote with lead time is returned within one working day.