Welcome to www.cnctt.com official website!

Unscrewing Mould in aluminium for short runs and fast cycling for consumer electronics – cycle times from 12 seconds, cavity tolerance ±0.02 mm

Unscrewing Mould in aluminium for short runs and fast cycling for consumer electronics – cycle times from 12 seconds, cavity tolerance ±0.02 mm. aluminium for short runs and fast cycling, cycle times

Get a Quote
Unscrewing Mould in aluminium for short runs and fast cycling for consumer electronics – cycle times from 12 seconds, cavity tolerance ±0.02 mm
Unscrewing Mould in aluminium for short runs and fast cycling for consumer electronics – cycle times from 12 seconds, cavity tolerance ±0.02 mm

Unscrewing Mould in aluminium for short runs and fast cycling for consumer electronics – cycle times from 12 seconds, cavity tolerance ±0.02 mm

Unscrewing Mould in aluminium for short runs and fast cycling for consumer electronics – cycle times from 12 seconds, cavity tolerance ±0.02 mm. aluminium for short runs and fast cycling, cycle times

Contact Number: 18681062885
Product Details

Unscrewing Mould in aluminium for short runs and fast cycling for consumer electronics – cycle times from 12 seconds, cavity tolerance ±0.02 mm

A Unscrewing Mould is a production process in steel: cooling, gating, venting and ejection have to work together before the first acceptable part appears. The Unscrewing Mould described here is built in aluminium for short runs and fast cycling and developed for consumer electronics. mould design, steel cutting, EDM detail, fitting and tool tryout is applied with tool life and the maintenance interval agreed before building starts.

The parts that matter most are the interfaces: bores, sealing faces, threads and mounting patterns. Those are held to cavity tolerance ±0.02 mm, verified against the drawing, and recorded before anything is packed.

Specification

ProcessMould design, steel cutting, edm detail, fitting and tool tryout
Material / configurationaluminium for short runs and fast cycling
Size / capacitycycle times from 12 seconds
Tolerancecavity tolerance ±0.02 mm
Surface finishSPI or VDI finish as specified
Applicationunscrewing mould for consumer electronics
InspectionDimensional report, material certificate, first article report on request
Lead time7–15 working days for samples, 3–4 weeks for production
Minimum order1 piece for prototypes, from 50 pieces for production pricing

Unscrewing Mould in aluminium for short runs and fast cycling for consumer electronics – cycle times from 12 seconds, cavity tolerance ±0.02 mm manufacturing detail

Manufacturing process

The operation sequence is decided before the first chip is cut: roughing to leave even stock, semi-finishing, then mould design, steel cutting, EDM detail, fitting and tool tryout as the final operation. That order is what keeps cavity tolerance ±0.02 mm stable as the batch runs and the machine warms up.

Material is purchased against a certificate and checked on receipt, so the composition is known before any cutting starts. Work in progress is identified by part number and operation, and the finished parts are deburred, cleaned and protected before they leave the machine area.

Typical applications

Most of the work supplied in this category falls into the following examples.

  • Electronic housings and connectors.
  • Automotive interior components.
  • Medical device disposables.
  • Appliance control panels.
  • Packaging closures.

Unscrewing Mould in aluminium for short runs and fast cycling for consumer electronics – cycle times from 12 seconds, cavity tolerance ±0.02 mm finished parts

Quality control and documentation

Every batch is measured against the drawing with calibrated equipment, and results are recorded against the part number rather than kept on a scrap of paper.

Material certificates to EN 10204 3.1, dimensional reports and first article inspection reports are issued with the shipment where the application requires them. Calibration dates and measurement uncertainty are recorded alongside every result.

Ordering, lead time and packaging

Quotations are returned within one working day of a complete drawing package. Lead time is quoted from drawing approval, not from the date of enquiry.

Unscrewing Mould in aluminium for short runs and fast cycling for consumer electronics – cycle times from 12 seconds, cavity tolerance ±0.02 mm inspection and packing

Frequently asked questions

How long does a mould take to build?

Prototype aluminium tools run 2 to 3 weeks, hardened production tools 6 to 10 weeks depending on cavity count, slides and the amount of EDM detail required.

What determines the steel choice?

Annual volume and resin. Abrasive or corrosive materials and volumes above a few hundred thousand shots justify hardened steel, while short runs are cheaper in aluminium.

Can you supply material and inspection certificates?

Yes. Material certificates to EN 10204 3.1, full dimensional reports, first article inspection reports and, where required, PPAP or AS9102 documentation are issued with the shipment.

To discuss unscrewing mould requirements, send the model and the drawing with the quantities required. Feedback on manufacturability is given free of charge before any order is placed.