Welcome to www.cnctt.com official website!

Gantry Loading System with a vision guided picking station for job shops running mixed batches – payload to 20 kg

Gantry Loading System with a vision guided picking station for job shops running mixed batches – payload to 20 kg. a vision guided picking station, payload to 20 kg, supplied to drawing with repeatabi

Get a Quote
Gantry Loading System with a vision guided picking station for job shops running mixed batches – payload to 20 kg
Gantry Loading System with a vision guided picking station for job shops running mixed batches – payload to 20 kg

Gantry Loading System with a vision guided picking station for job shops running mixed batches – payload to 20 kg

Gantry Loading System with a vision guided picking station for job shops running mixed batches – payload to 20 kg. a vision guided picking station, payload to 20 kg, supplied to drawing with repeatabi

Contact Number: 18681062885
Product Details

Gantry Loading System with a vision guided picking station for job shops running mixed batches – payload to 20 kg

A Gantry Loading System keeps the spindle cutting while nobody is standing in front of the machine, which is measured in spindle hours per day rather than in cycle time. The Gantry Loading System described here is built with a vision guided picking station and specified for job shops running mixed batches. robot integration with custom grippers, guarding and machine interface sits behind the numbers below, which are stated as delivered rather than as a best case.

The parts that matter most are the interfaces: bores, sealing faces, threads and mounting patterns. Those are held to repeatability ±0.05 mm, verified against the drawing, and recorded before anything is packed.

Specification

ProcessRobot integration with custom grippers, guarding and machine interface
Material / configurationa vision guided picking station
Size / capacitypayload to 20 kg
Tolerancerepeatability ±0.05 mm
Surface finishanodised and powder coated frames
Applicationgantry loading system for job shops running mixed batches
InspectionDimensional report, material certificate, first article report on request
Lead time7–15 working days for samples, 3–4 weeks for production
Minimum order1 piece for prototypes, from 50 pieces for production pricing

Gantry Loading System with a vision guided picking station for job shops running mixed batches – payload to 20 kg manufacturing detail

Manufacturing process

The operation sequence is decided before the first chip is cut: roughing to leave even stock, semi-finishing, then robot integration with custom grippers, guarding and machine interface as the final operation. That order is what keeps repeatability ±0.05 mm stable as the batch runs and the machine warms up.

Material is purchased against a certificate and checked on receipt, so the composition is known before any cutting starts. Work in progress is identified by part number and operation, and the finished parts are deburred, cleaned and protected before they leave the machine area.

Typical applications

Most of the work supplied in this category falls into the following examples.

  • Loading raw castings into machining centres.
  • Unloading finished shafts from lathes.
  • Transferring parts between two operations.
  • Servicing injection moulding machines.
  • Deburring and washing before packing.

Gantry Loading System with a vision guided picking station for job shops running mixed batches – payload to 20 kg finished parts

Quality control and documentation

Every batch is measured against the drawing with calibrated equipment, and results are recorded against the part number rather than kept on a scrap of paper.

Material certificates to EN 10204 3.1, dimensional reports and first article inspection reports are issued with the shipment where the application requires them. Calibration dates and measurement uncertainty are recorded alongside every result.

Ordering, lead time and packaging

Quotations are returned within one working day of a complete drawing package. Lead time is quoted from drawing approval, not from the date of enquiry.

Gantry Loading System with a vision guided picking station for job shops running mixed batches – payload to 20 kg inspection and packing

Frequently asked questions

How much output does machine tending really add?

It converts breaks, changeovers and unattended hours into cutting time. Spindle utilisation typically moves from around 45 per cent to above 80 per cent without changing the process.

What stops a robot cell from running unattended?

Part presentation and recovery, not the robot. Grippers, Input-output handshakes with the machine control and a defined restart routine decide whether faults clear themselves.

What file formats do you need for a quotation?

STEP or IGES for the 3D model and a PDF drawing with tolerances, material and surface finish called out. Native files from SolidWorks, Creo or Inventor are also accepted.

To discuss gantry loading system requirements, send the model and the drawing with the quantities required. Feedback on manufacturability is given free of charge before any order is placed.