CNC Drilling Machine FAQ: the questions buyers ask

CNC Drilling Machine is a machine dedicated to producing holes, with a spindle feed and often a multi spindle head. It is used for production drilling, tapping and countersinking on parts with many holes. This entry explains what it is, what the numbers on a data sheet mean, and what to put on a drawing.
It is written from the point of view of the buyer and the drawing office: the values that are realistic in production, the ones that cost money, and the way the result is verified. Where an industry sets the requirement, rail is used as the example: documented welds, coatings and fire smoke toxicity compliance.
The questions buyers ask
What is CNC Drilling Machine used for?
It is used for production drilling, tapping and countersinking on parts with many holes. A machine dedicated to producing holes, with a spindle feed and often a multi spindle head.
What tolerance can be held?
±0.1 mm position, H9 by reaming is typical, held on the features that carry the function and confirmed by plug gauge for size, CMM for position.
Which material should be specified?
S355 steel is the usual choice; the certificate requirement is in-house approval with dimensional reports.
What finish comes as standard?
Ra 3.2 µm as drilled, Ra 1.6 µm reamed. A finer finish is a separate operation and is quoted as one.
How long does it take?
A realistic cycle is 2 to 20 minutes for a plate, and the cost driver is hole count and tool changes, not the drilling itself.
What information is needed for a quotation?
A STEP or IGES model and a PDF drawing with tolerances, material and finish called out, plus the quantity and the expected repeat frequency.
Can the same result be guaranteed on a repeat order?
Yes, because the fixtures, tool lists and verified programmes are retained for the life of the part number.
What is the most common mistake on the drawing?
The drill wandering on a curved or angled entry face.

Applications
CNC Drilling Machine is used for production drilling, tapping and countersinking on parts with many holes, and in practice it appears most often in flange patterns, structural plates, manifold faces, rail and frame parts.
How it fits into a machining route
CNC Drilling Machine is one station in a route rather than the whole of it. The part arrives with the previous operation finished and leaves with the features it is responsible for completed, so the datum and the clamping method are agreed before the first part rather than discovered on it.The route is fixed before the first part is cut, and it is the route rather than the individual setting that holds the result: hole count and tool changes, not the drilling itself. Where a drawing calls for something the route cannot hold economically, that is raised at quotation rather than after the parts are made.
Standards, documentation and what is issued
The documentation requirement is in-house approval with dimensional reports. Material is supplied against a certificate where the application calls for it, inspection results are recorded with the job, and the records are kept so that a repeat order can be compared with the first instead of being measured from scratch.
Plug gauge for size, CMM for position is the verification step. Where a customer format or a standard report is required, it is agreed before the batch starts, because a report written after the event is a report nobody can use.
Frequently asked questions
What tolerance should be specified for CNC Drilling Machine?
±0.1 mm position, H9 by reaming is realistic in production. Tightening it beyond the functional requirement increases cost without improving the part.
Which material is usually used?
S355 steel is the usual choice, supplied against in-house approval with dimensional reports.
How is the result verified?
Plug gauge for size, CMM for position, with the results recorded so a repeat order can be compared with the first.
What is the most common mistake?
A pecking cycle that is too shallow, so chips pack in a deep hole.
How long does it take and what does it cost?
A realistic cycle is 2 to 20 minutes for a plate, and the cost driver is hole count and tool changes, not the drilling itself.

Related capability
If you are specifying CNC Drilling Machine on a drawing and want a second opinion on the route, send the model and the quantity. The first response is a manufacturability review with the likely risk points and a quotation, so the decision can be made on facts rather than on a price alone.
Machining, inspection and documentation are handled in one place, which is why the dimensional report and the material certificate arrive with the parts rather than after them.
Related entries
These entries sit next to CNC Drilling Machine in the encyclopedia: Swiss-Type Lathe, Turn-Mill Centre, Thread Milling. Reading them together gives a fuller picture of how the process, the material and the measurement affect each other.