Deep Hole Drilling inspection and measurement methods

Deep Hole Drilling is drilling holes deeper than about ten times the diameter, with guided tools and high pressure coolant. It is used for cooling channels, hydraulic bores and long oil ways that cannot be reached with a twist drill. This entry explains what it is, what the numbers on a data sheet mean, and what to put on a drawing.

It is written from the point of view of the buyer and the drawing office: the values that are realistic in production, the ones that cost money, and the way the result is verified. Where an industry sets the requirement, rail is used as the example: documented welds, coatings and fire smoke toxicity compliance.

How it is measured

Bore gauge and a straightness check. The equipment is calibrated, the uncertainty is recorded, and the part is at room temperature before the first point is taken.

SpecificationTypical value
CharacteristicMethod
Sizegauge or CMM, to the drawing tolerance
GeometryCMM evaluated against the datum frame
SurfaceRa 3.2 µm as drilled
Materialin-house approval with dimensional reports
Tolerance±0.05 mm on diameter, straightness by process

What the report contains

  • Every feature called up on the drawing, with a measured value rather than a tick.
  • The datum order used, so the report can be reproduced.
  • The certificate reference for the material and the calibration dates for the equipment.

Common sources of dispute

Most disagreements are about method, not about the part: a warm part, a burr left on, or a datum taken in a different order. Provide a square entry face or a drilled start bushing

Deep Hole Drilling – application detail

Applications

Deep Hole Drilling is used for cooling channels, hydraulic bores and long oil ways that cannot be reached with a twist drill, and in practice it appears most often in mould cooling channels, hydraulic cylinder bores, spindle oil ways, heat exchanger plates.

How it fits into a machining route

Deep Hole Drilling is one operation in a sequence: roughing to leave even stock, any stress relieving the geometry needs, semi finishing, then the finishing operation that holds the tolerance. The order is what keeps the result stable as the machine warms up and the batch runs.

The route is fixed before the first part is cut, and it is the route rather than the individual setting that holds the result: set up and coolant filtration, not the cutting time. Where a drawing calls for something the route cannot hold economically, that is raised at quotation rather than after the parts are made.

Standards, documentation and what is issued

The documentation requirement is in-house approval with dimensional reports. Material is supplied against a certificate where the application calls for it, inspection results are recorded with the job, and the records are kept so that a repeat order can be compared with the first instead of being measured from scratch.

Bore gauge and a straightness check is the verification step. Where a customer format or a standard report is required, it is agreed before the batch starts, because a report written after the event is a report nobody can use.

Frequently asked questions

What tolerance should be specified for Deep Hole Drilling?

±0.05 mm on diameter, straightness by process is realistic in production. Tightening it beyond the functional requirement increases cost without improving the part.

Which material is usually used?

4140 alloy steel is the usual choice, supplied against in-house approval with dimensional reports.

How is the result verified?

Bore gauge and a straightness check, with the results recorded so a repeat order can be compared with the first.

What is the most common mistake?

The entry face not square, which walks the drill off position.

How long does it take and what does it cost?

A realistic cycle is 10 to 60 minutes per hole, and the cost driver is set up and coolant filtration, not the cutting time.

Deep Hole Drilling – inspection and packing

Related capability

If you are specifying Deep Hole Drilling on a drawing and want a second opinion on the route, send the model and the quantity. The first response is a manufacturability review with the likely risk points and a quotation, so the decision can be made on facts rather than on a price alone.

Machining, inspection and documentation are handled in one place, which is why the dimensional report and the material certificate arrive with the parts rather than after them.