Welcome to www.cnctt.com official website!

PPAP Submission setup, maintenance and daily checks

PPAP Submission is the production part approval process used in the automotive supply chain, at four levels of evidence It is used for proving that a production process can make the part repeatedly, before series supply

Get a Quote
PPAP Submission setup, maintenance and daily checks

PPAP Submission setup, maintenance and daily checks

Source:Product Encyclopedia / Time:2026-09-16

PPAP Submission setup, maintenance and daily checks

PPAP Submission is the production part approval process used in the automotive supply chain, at four levels of evidence. It is used for proving that a production process can make the part repeatedly, before series supply starts. This entry explains what it is, what the numbers on a data sheet mean, and what to put on a drawing.

It is written from the point of view of the buyer and the drawing office: the values that are realistic in production, the ones that cost money, and the way the result is verified. Where an industry sets the requirement, aerospace is used as the example: traceability and a first article before anything enters the batch.

Setup

  1. Establish the datum on the part or the fixture and indicate it, rather than assuming it.
  2. Set the tools and record the offsets; a tool length set by eye is the commonest source of a scrapped first part.
  3. Run a first part, measure it, and adjust from the measurement.

Daily checks

  • Coolant concentration and flow, because a dry cut changes both the tool life and the size.
  • Chip clearance in the fixture, because a chip under the part moves it.
  • Verification: a full dimensional report plus a capability study, repeated at the start of a run and after any adjustment.

Wear and consumables

Tools, filters and coolant are consumables, not overheads. The documentation effort and the capability study, and the cost of replacing them early is far below the cost of a scrap part.

SpecificationTypical value
Level 1a part submission warrant only
Level 3the warrant with dimensional results and records
Level 4as level 3 plus additional customer requirements
Contentdimensional report, material certificate, control plan, capability study
Capabilityusually Cpk 1.33 or better on critical characteristics
Timingbefore the first production shipment

PPAP Submission – application detail

Applications

PPAP Submission is used for proving that a production process can make the part repeatedly, before series supply starts, and in practice it appears most often in automotive series production, tier two supply, any customer working to IATF 16949, high volume repeat orders.

How it fits into a machining route

PPAP Submission applies to the whole drawing rather than to one operation. It sets how the part is measured as much as how it is made, which is why it belongs on the drawing from the first issue and not in a note added after a query.

The route is fixed before the first part is cut, and it is the route rather than the individual setting that holds the result: the documentation effort and the capability study. Where a drawing calls for something the route cannot hold economically, that is raised at quotation rather than after the parts are made.

Standards, documentation and what is issued

The documentation requirement is IATF 16949 with a PPAP submission at the level stated by the customer. Material is supplied against a certificate where the application calls for it, inspection results are recorded with the job, and the records are kept so that a repeat order can be compared with the first instead of being measured from scratch.

A full dimensional report plus a capability study is the verification step. Where a customer format or a standard report is required, it is agreed before the batch starts, because a report written after the event is a report nobody can use.

Frequently asked questions

What tolerance should be specified for PPAP Submission?

as the drawing, with capability on critical characteristics is realistic in production. Tightening it beyond the functional requirement increases cost without improving the part.

Which material is usually used?

any is the usual choice, supplied against IATF 16949 with a PPAP submission at the level stated by the customer.

How is the result verified?

A full dimensional report plus a capability study, with the results recorded so a repeat order can be compared with the first.

What is the most common mistake?

A control plan that describes a different process from the one that runs.

How long does it take and what does it cost?

A realistic cycle is a day of documentation for a level 3, and the cost driver is the documentation effort and the capability study.

PPAP Submission – inspection and packing

Related capability

If you are specifying PPAP Submission on a drawing and want a second opinion on the route, send the model and the quantity. The first response is a manufacturability review with the likely risk points and a quotation, so the decision can be made on facts rather than on a price alone.

Machining, inspection and documentation are handled in one place, which is why the dimensional report and the material certificate arrive with the parts rather than after them.

Related entries

These entries sit next to PPAP Submission in the encyclopedia: EN 10204 Material Certificates, Geometric Dimensioning and Tolerancing, Reaming and Boring. Reading them together gives a fuller picture of how the process, the material and the measurement affect each other.