Surface finish achievable with Sinker EDM Machine

Sinker EDM Machine is a machine that forms a cavity by sparking a shaped electrode into the workpiece under dielectric fluid. It is used for blind cavities, sharp corners, deep ribs and textured mould surfaces. This entry explains what it is, what the numbers on a data sheet mean, and what to put on a drawing.
It is written from the point of view of the buyer and the drawing office: the values that are realistic in production, the ones that cost money, and the way the result is verified. Where an industry sets the requirement, robotics is used as the example: repeatability across a family of near identical parts.
What finish is achievable
The finish left by Sinker EDM Machine is Ra 0.8 µm standard, Ra 0.4 µm with a fine finishing circuit. It is measured with a stylus instrument and reported as Ra, and the lay – the direction of the pattern – matters as much as the value on a face that seals or slides.
| Aspect | Value |
|---|---|
| Finish | Ra 0.8 µm standard, Ra 0.4 µm with a fine finishing circuit |
| Process | Sinker EDM Machine |
| Measurement | stylus instrument or comparison sample |
| Tolerance held | ±0.01 mm |
| Effect of cost | electrode count and electrode machining, not the sparking itself |
How it is improved
A finer finish is a separate operation, not a setting: a finishing pass, a dressing pass, or a secondary process. Electrode count and electrode machining, not the sparking itself, so the call out belongs only on the faces that need it.
How it is checked
CMM for position, comparator for the profile. Where the drawing gives a value, the report records where and how it was measured, because the same face can read differently in different directions.

Applications
Sinker EDM Machine is used for blind cavities, sharp corners, deep ribs and textured mould surfaces, and in practice it appears most often in injection mould cavities, forging dies, turbine blade root forms, deep ribbed housings.
How it fits into a machining route
Sinker EDM Machine is one station in a route rather than the whole of it. The part arrives with the previous operation finished and leaves with the features it is responsible for completed, so the datum and the clamping method are agreed before the first part rather than discovered on it.The route is fixed before the first part is cut, and it is the route rather than the individual setting that holds the result: electrode count and electrode machining, not the sparking itself. Where a drawing calls for something the route cannot hold economically, that is raised at quotation rather than after the parts are made.
Standards, documentation and what is issued
The documentation requirement is in-house approval with dimensional reports. Material is supplied against a certificate where the application calls for it, inspection results are recorded with the job, and the records are kept so that a repeat order can be compared with the first instead of being measured from scratch.
CMM for position, comparator for the profile is the verification step. Where a customer format or a standard report is required, it is agreed before the batch starts, because a report written after the event is a report nobody can use.
Frequently asked questions
What tolerance should be specified for Sinker EDM Machine?
±0.01 mm is realistic in production. Tightening it beyond the functional requirement increases cost without improving the part.
Which material is usually used?
H13 tool steel is the usual choice, supplied against in-house approval with dimensional reports.
How is the result verified?
CMM for position, comparator for the profile, with the results recorded so a repeat order can be compared with the first.
What is the most common mistake?
The recast layer left in place on a part that will see fatigue loading.
How long does it take and what does it cost?
A realistic cycle is 4 to 20 hours for a mould cavity, and the cost driver is electrode count and electrode machining, not the sparking itself.

Related capability
If you are specifying Sinker EDM Machine on a drawing and want a second opinion on the route, send the model and the quantity. The first response is a manufacturability review with the likely risk points and a quotation, so the decision can be made on facts rather than on a price alone.
Machining, inspection and documentation are handled in one place, which is why the dimensional report and the material certificate arrive with the parts rather than after them.
Related entries
These entries sit next to Sinker EDM Machine in the encyclopedia: Surface Grinding Machine, Cylindrical Grinding Machine, High Speed Machining. Reading them together gives a fuller picture of how the process, the material and the measurement affect each other.