Welcome to www.cnctt.com official website!

Materials and Mould Inserts: what works and what does not

Mould Inserts is a replaceable steel component that forms part of a mould cavity It is used for moulds where a wear area, a core or a detail needs to be replaced or machined separately. Typical values: material H13, or a

Get a Quote
Materials and Mould Inserts: what works and what does not

Materials and Mould Inserts: what works and what does not

Source:Product Encyclopedia / Time:2026-09-16

Materials and Mould Inserts: what works and what does not

Mould Inserts is a replaceable steel component that forms part of a mould cavity. It is used for moulds where a wear area, a core or a detail needs to be replaced or machined separately. This entry explains what it is, what the numbers on a data sheet mean, and what to put on a drawing.

It is written from the point of view of the buyer and the drawing office: the values that are realistic in production, the ones that cost money, and the way the result is verified. Where an industry sets the requirement, robotics is used as the example: repeatability across a family of near identical parts.

What works with it

The material and the process are chosen together. For work involving Mould Inserts the usual choice is H13 tool steel, for the reason that the detail and the finishing requirement.

  • %s – the default, because it balances cost, availability and machinability.
  • Stainless grades – chosen where corrosion resistance or cleaning rules decide the material.
  • Aluminium grades – chosen where weight or thermal conductivity matters more than strength.
  • Engineering plastics – chosen where insulation, weight or chemical resistance is the point.

What to watch

Material behaviour changes the process before it changes the drawing. A grade that work hardens needs a different tool geometry and a different feed, and a certificate requirement such as in-house approval with dimensional reports has to be on the order before the bar is cut.

SpecificationTypical value
MaterialH13, or a higher alloy for abrasive plastic
Hardness48 to 52 HRC typical
Typical tolerance±0.01 mm on the shut off faces
Surface finishto the mould texture specification, or polished
Fittinginterchangeable, with a locating method
Coolingdrilled channels or a baffle

Mould Inserts – application detail

Applications

Mould Inserts is used for moulds where a wear area, a core or a detail needs to be replaced or machined separately, and in practice it appears most often in injection moulds, die casting tools, blow moulds, prototype tooling.

How it fits into a machining route

Mould Inserts is produced by whichever route reaches it most reliably, and it is usually the reason the rest of the part is dimensioned the way it is. Datums are chosen so that this feature is measured from what it actually has to be square or concentric with.

The route is fixed before the first part is cut, and it is the route rather than the individual setting that holds the result: the detail and the finishing requirement. Where a drawing calls for something the route cannot hold economically, that is raised at quotation rather than after the parts are made.

Standards, documentation and what is issued

The documentation requirement is in-house approval with dimensional reports. Material is supplied against a certificate where the application calls for it, inspection results are recorded with the job, and the records are kept so that a repeat order can be compared with the first instead of being measured from scratch.

CMM for the form, and a fit check in the bolster is the verification step. Where a customer format or a standard report is required, it is agreed before the batch starts, because a report written after the event is a report nobody can use.

Frequently asked questions

What tolerance should be specified for Mould Inserts?

±0.01 mm is realistic in production. Tightening it beyond the functional requirement increases cost without improving the part.

Which material is usually used?

H13 tool steel is the usual choice, supplied against in-house approval with dimensional reports.

How is the result verified?

CMM for the form, and a fit check in the bolster, with the results recorded so a repeat order can be compared with the first.

What is the most common mistake?

A shut off face that is not square, which flashes.

How long does it take and what does it cost?

A realistic cycle is 4 to 20 hours per insert, and the cost driver is the detail and the finishing requirement.

Mould Inserts – inspection and packing

Related capability

If you are specifying Mould Inserts on a drawing and want a second opinion on the route, send the model and the quantity. The first response is a manufacturability review with the likely risk points and a quotation, so the decision can be made on facts rather than on a price alone.

Machining, inspection and documentation are handled in one place, which is why the dimensional report and the material certificate arrive with the parts rather than after them.

Related entries

These entries sit next to Mould Inserts in the encyclopedia: Hydraulic Manifolds, Heat Sinks, EN 10204 Material Certificates. Reading them together gives a fuller picture of how the process, the material and the measurement affect each other.