Duplex 2205 Stainless Steel vs Inconel 718: which one fits your part

Duplex 2205 Stainless Steel is a two phase stainless steel with roughly equal ferrite and austenite. It is used for parts that need high strength and resistance to chloride stress corrosion. This entry explains what it is, what the numbers on a data sheet mean, and what to put on a drawing.
It is written from the point of view of the buyer and the drawing office: the values that are realistic in production, the ones that cost money, and the way the result is verified. Where an industry sets the requirement, rail is used as the example: documented welds, coatings and fire smoke toxicity compliance.
The short answer
Duplex 2205 Stainless Steel and Inconel 718 overlap, but they are not interchangeable. Choose Duplex 2205 Stainless Steel when the requirement is parts that need high strength and resistance to chloride stress corrosion; choose Inconel 718 when the requirement is turbine, downhole and high temperature parts where creep and oxidation set the limit.
Side by side
| Point of comparison | Duplex 2205 Stainless Steel | Inconel 718 |
|---|---|---|
| What it is | a two phase stainless steel with roughly equal ferrite and austenite | a nickel chromium super alloy that holds strength at high temperature |
| Used for | parts that need high strength and resistance to chloride stress corrosion | turbine, downhole and high temperature parts where creep and oxidation set the limit |
| Typical tolerance | ±0.02 mm | ±0.02 mm |
| Surface finish | Ra 1.6 µm as machined | Ra 1.6 µm as machined |
| Cost driver | cutting time and the cost of the material | tool consumption and cutting time |
Which one fits your part
Work from the feature that has to work. If the requirement is parts that need high strength and resistance to chloride stress corrosion, Duplex 2205 Stainless Steel is the safer call; if it is turbine, downhole and high temperature parts where creep and oxidation set the limit, Inconel 718 wins on cost or on lead time. Where the drawing does not make it clear, that is the question to settle before quotation rather than after.
A note on specification
Write the drawing so that either route can be considered where the function allows. That keeps the quotation competitive and stops a process being specified where a result should have been.

Applications
Duplex 2205 Stainless Steel is used for parts that need high strength and resistance to chloride stress corrosion, and in practice it appears most often in offshore hardware, chemical plant, pressure vessels, pump and valve parts.
How it fits into a machining route
Duplex 2205 Stainless Steel is chosen at the drawing stage, and everything downstream follows from it: the tool geometry, the cutting data, the heat treatment and the certificate. Changing the grade later is a different part, not a different quote.The route is fixed before the first part is cut, and it is the route rather than the individual setting that holds the result: cutting time and the cost of the material. Where a drawing calls for something the route cannot hold economically, that is raised at quotation rather than after the parts are made.
Standards, documentation and what is issued
The documentation requirement is EN 10204 3.1 with NORSOK where required. Material is supplied against a certificate where the application calls for it, inspection results are recorded with the job, and the records are kept so that a repeat order can be compared with the first instead of being measured from scratch.
Dimensional inspection with a certificate review is the verification step. Where a customer format or a standard report is required, it is agreed before the batch starts, because a report written after the event is a report nobody can use.
Frequently asked questions
What tolerance should be specified for Duplex 2205 Stainless Steel?
±0.02 mm is realistic in production. Tightening it beyond the functional requirement increases cost without improving the part.
Which material is usually used?
duplex 2205 stainless steel is the usual choice, supplied against EN 10204 3.1 with NORSOK where required.
How is the result verified?
Dimensional inspection with a certificate review, with the results recorded so a repeat order can be compared with the first.
What is the most common mistake?
Welding it without controlling the heat input, which upsets the phase balance.
How long does it take and what does it cost?
A realistic cycle is slow, with a rigid setup required, and the cost driver is cutting time and the cost of the material.

Related capability
If you are specifying Duplex 2205 Stainless Steel on a drawing and want a second opinion on the route, send the model and the quantity. The first response is a manufacturability review with the likely risk points and a quotation, so the decision can be made on facts rather than on a price alone.
Machining, inspection and documentation are handled in one place, which is why the dimensional report and the material certificate arrive with the parts rather than after them.