Welcome to www.cnctt.com official website!

Wire EDM vs Reaming and Boring: which one fits your part

Wire EDM is a spark erosion process that cuts a profile with a thin travelling wire in deionised water It is used for cutting hardened material, sharp internal corners and parts with no cutting force. Typical values: typ

Get a Quote
Wire EDM vs Reaming and Boring: which one fits your part

Wire EDM vs Reaming and Boring: which one fits your part

Source:Product Encyclopedia / Time:2026-09-16

Wire EDM vs Reaming and Boring: which one fits your part

Wire EDM is a spark erosion process that cuts a profile with a thin travelling wire in deionised water. It is used for cutting hardened material, sharp internal corners and parts with no cutting force. This entry explains what it is, what the numbers on a data sheet mean, and what to put on a drawing.

It is written from the point of view of the buyer and the drawing office: the values that are realistic in production, the ones that cost money, and the way the result is verified. Where an industry sets the requirement, robotics is used as the example: repeatability across a family of near identical parts.

The short answer

Wire EDM and Reaming and Boring overlap, but they are not interchangeable. Choose Wire EDM when the requirement is cutting hardened material, sharp internal corners and parts with no cutting force; choose Reaming and Boring when the requirement is holding hole size and position more closely than drilling can.

Side by side

Point of comparisonWire EDMReaming and Boring
What it isa spark erosion process that cuts a profile with a thin travelling wire in deionised waterfinishing a hole to size with a multi tooth reamer or an adjustable single point boring head
Used forcutting hardened material, sharp internal corners and parts with no cutting forceholding hole size and position more closely than drilling can
Typical tolerance±0.005 mmH7
Surface finishRa 0.4 µm with one skim passRa 1.6 µm reamed
Cost drivercutting area and the number of skim passesthe number of size adjustments and the gauge check

Which one fits your part

Work from the feature that has to work. If the requirement is cutting hardened material, sharp internal corners and parts with no cutting force, Wire EDM is the safer call; if it is holding hole size and position more closely than drilling can, Reaming and Boring wins on cost or on lead time. Where the drawing does not make it clear, that is the question to settle before quotation rather than after.

A note on specification

Write the drawing so that either route can be considered where the function allows. That keeps the quotation competitive and stops a process being specified where a result should have been.

Wire EDM – application detail

Applications

Wire EDM is used for cutting hardened material, sharp internal corners and parts with no cutting force, and in practice it appears most often in punch and die work, hardened gauges, prototype laminations, medical cutting tools.

How it fits into a machining route

Wire EDM is one operation in a sequence: roughing to leave even stock, any stress relieving the geometry needs, semi finishing, then the finishing operation that holds the tolerance. The order is what keeps the result stable as the machine warms up and the batch runs.

The route is fixed before the first part is cut, and it is the route rather than the individual setting that holds the result: cutting area and the number of skim passes. Where a drawing calls for something the route cannot hold economically, that is raised at quotation rather than after the parts are made.

Standards, documentation and what is issued

The documentation requirement is in-house approval with dimensional reports. Material is supplied against a certificate where the application calls for it, inspection results are recorded with the job, and the records are kept so that a repeat order can be compared with the first instead of being measured from scratch.

Optical comparator and surface roughness gauge is the verification step. Where a customer format or a standard report is required, it is agreed before the batch starts, because a report written after the event is a report nobody can use.

Frequently asked questions

What tolerance should be specified for Wire EDM?

±0.005 mm is realistic in production. Tightening it beyond the functional requirement increases cost without improving the part.

Which material is usually used?

D2 tool steel is the usual choice, supplied against in-house approval with dimensional reports.

How is the result verified?

Optical comparator and surface roughness gauge, with the results recorded so a repeat order can be compared with the first.

What is the most common mistake?

Assuming a sharp internal corner is free: the wire has a radius.

How long does it take and what does it cost?

A realistic cycle is 1 to 8 hours depending on height, and the cost driver is cutting area and the number of skim passes.

Wire EDM – inspection and packing

Related capability

If you are specifying Wire EDM on a drawing and want a second opinion on the route, send the model and the quantity. The first response is a manufacturability review with the likely risk points and a quotation, so the decision can be made on facts rather than on a price alone.

Machining, inspection and documentation are handled in one place, which is why the dimensional report and the material certificate arrive with the parts rather than after them.

Related entries

These entries sit next to Wire EDM in the encyclopedia: Sinker EDM, Deburring, 2024-T3 Aluminium. Reading them together gives a fuller picture of how the process, the material and the measurement affect each other.