Deburring vs Reaming and Boring: which one fits your part

Deburring is the removal of burrs and the rounding of sharp edges after machining. It is used for making parts safe to handle, and stopping burrs from interfering with assembly. This entry explains what it is, what the numbers on a data sheet mean, and what to put on a drawing.
It is written from the point of view of the buyer and the drawing office: the values that are realistic in production, the ones that cost money, and the way the result is verified. Where an industry sets the requirement, robotics is used as the example: repeatability across a family of near identical parts.
The short answer
Deburring and Reaming and Boring overlap, but they are not interchangeable. Choose Deburring when the requirement is making parts safe to handle, and stopping burrs from interfering with assembly; choose Reaming and Boring when the requirement is holding hole size and position more closely than drilling can.
Side by side
| Point of comparison | Deburring | Reaming and Boring |
|---|---|---|
| What it is | the removal of burrs and the rounding of sharp edges after machining | finishing a hole to size with a multi tooth reamer or an adjustable single point boring head |
| Used for | making parts safe to handle, and stopping burrs from interfering with assembly | holding hole size and position more closely than drilling can |
| Typical tolerance | not a dimensional process | H7 |
| Surface finish | edge condition defined by the drawing note | Ra 1.6 µm reamed |
| Cost driver | labour, because most deburring is still manual | the number of size adjustments and the gauge check |
Which one fits your part
Work from the feature that has to work. If the requirement is making parts safe to handle, and stopping burrs from interfering with assembly, Deburring is the safer call; if it is holding hole size and position more closely than drilling can, Reaming and Boring wins on cost or on lead time. Where the drawing does not make it clear, that is the question to settle before quotation rather than after.
A note on specification
Write the drawing so that either route can be considered where the function allows. That keeps the quotation competitive and stops a process being specified where a result should have been.

Applications
Deburring is used for making parts safe to handle, and stopping burrs from interfering with assembly, and in practice it appears most often in hydraulic parts, medical instruments, aerospace fittings, any part that is handled.
How it fits into a machining route
Deburring is one operation in a sequence: roughing to leave even stock, any stress relieving the geometry needs, semi finishing, then the finishing operation that holds the tolerance. The order is what keeps the result stable as the machine warms up and the batch runs.The route is fixed before the first part is cut, and it is the route rather than the individual setting that holds the result: labour, because most deburring is still manual. Where a drawing calls for something the route cannot hold economically, that is raised at quotation rather than after the parts are made.
Standards, documentation and what is issued
The documentation requirement is in-house approval with visual inspection. Material is supplied against a certificate where the application calls for it, inspection results are recorded with the job, and the records are kept so that a repeat order can be compared with the first instead of being measured from scratch.
Visual and tactile, against an agreed sample is the verification step. Where a customer format or a standard report is required, it is agreed before the batch starts, because a report written after the event is a report nobody can use.
Frequently asked questions
What tolerance should be specified for Deburring?
not a dimensional process is realistic in production. Tightening it beyond the functional requirement increases cost without improving the part.
Which material is usually used?
any machined material is the usual choice, supplied against in-house approval with visual inspection.
How is the result verified?
Visual and tactile, against an agreed sample, with the results recorded so a repeat order can be compared with the first.
What is the most common mistake?
Media trapped in a cross hole, which is found at assembly.
How long does it take and what does it cost?
A realistic cycle is 2 to 30 minutes per part, and the cost driver is labour, because most deburring is still manual.

Related capability
If you are specifying Deburring on a drawing and want a second opinion on the route, send the model and the quantity. The first response is a manufacturability review with the likely risk points and a quotation, so the decision can be made on facts rather than on a price alone.
Machining, inspection and documentation are handled in one place, which is why the dimensional report and the material certificate arrive with the parts rather than after them.
Related entries
These entries sit next to Deburring in the encyclopedia: CNC Milling, CNC Turning, 304 Stainless Steel. Reading them together gives a fuller picture of how the process, the material and the measurement affect each other.