Deep Hole Drilling specifications: what the numbers mean

Deep Hole Drilling is drilling holes deeper than about ten times the diameter, with guided tools and high pressure coolant. It is used for cooling channels, hydraulic bores and long oil ways that cannot be reached with a twist drill. This entry explains what it is, what the numbers on a data sheet mean, and what to put on a drawing.
It is written from the point of view of the buyer and the drawing office: the values that are realistic in production, the ones that cost money, and the way the result is verified. Where an industry sets the requirement, medical is used as the example: validation evidence that matches the drawing exactly.
What the numbers mean
A data sheet for Deep Hole Drilling is only useful if the numbers are read against the job. The usual entries, and what they tell you, are these.
- Depth to diameter ratio – 10:1 to 100:1.
- Hole diameter – 3 to 40 mm.
- Straightness – 0.5 mm per metre achievable.
- Surface finish – Ra 1.6 to 3.2 µm.
- Coolant pressure – 20 to 100 bar.
- Tool type – gun drill or BTA system.
Comparing offers
Two suppliers can quote the same depth to diameter ratio and mean different things, because the figures are often quoted under the most favourable conditions. Ask what the value is measured over, what the material was, and whether it is a typical or a guaranteed figure.
| Specification | Typical value |
|---|---|
| Depth to diameter ratio | 10:1 to 100:1 |
| Hole diameter | 3 to 40 mm |
| Straightness | 0.5 mm per metre achievable |
| Surface finish | Ra 1.6 to 3.2 µm |
| Coolant pressure | 20 to 100 bar |
| Tool type | gun drill or BTA system |
What to check before specifying
Make sure the value you need is the value you have called up. Provide a square entry face or a drilled start bushing, and the difference between a typical and a worst case figure is where most disputes start.

Applications
Deep Hole Drilling is used for cooling channels, hydraulic bores and long oil ways that cannot be reached with a twist drill, and in practice it appears most often in mould cooling channels, hydraulic cylinder bores, spindle oil ways, heat exchanger plates.
How it fits into a machining route
Deep Hole Drilling is one operation in a sequence: roughing to leave even stock, any stress relieving the geometry needs, semi finishing, then the finishing operation that holds the tolerance. The order is what keeps the result stable as the machine warms up and the batch runs.The route is fixed before the first part is cut, and it is the route rather than the individual setting that holds the result: set up and coolant filtration, not the cutting time. Where a drawing calls for something the route cannot hold economically, that is raised at quotation rather than after the parts are made.
Standards, documentation and what is issued
The documentation requirement is in-house approval with dimensional reports. Material is supplied against a certificate where the application calls for it, inspection results are recorded with the job, and the records are kept so that a repeat order can be compared with the first instead of being measured from scratch.
Bore gauge and a straightness check is the verification step. Where a customer format or a standard report is required, it is agreed before the batch starts, because a report written after the event is a report nobody can use.
Frequently asked questions
What tolerance should be specified for Deep Hole Drilling?
±0.05 mm on diameter, straightness by process is realistic in production. Tightening it beyond the functional requirement increases cost without improving the part.
Which material is usually used?
4140 alloy steel is the usual choice, supplied against in-house approval with dimensional reports.
How is the result verified?
Bore gauge and a straightness check, with the results recorded so a repeat order can be compared with the first.
What is the most common mistake?
The entry face not square, which walks the drill off position.
How long does it take and what does it cost?
A realistic cycle is 10 to 60 minutes per hole, and the cost driver is set up and coolant filtration, not the cutting time.

Related capability
If you are specifying Deep Hole Drilling on a drawing and want a second opinion on the route, send the model and the quantity. The first response is a manufacturability review with the likely risk points and a quotation, so the decision can be made on facts rather than on a price alone.
Machining, inspection and documentation are handled in one place, which is why the dimensional report and the material certificate arrive with the parts rather than after them.
Related entries
These entries sit next to Deep Hole Drilling in the encyclopedia: Deburring, CNC Milling, C3604 Brass. Reading them together gives a fuller picture of how the process, the material and the measurement affect each other.